By the summer of 1824, work along this section of the Deep Cut was reaching its maximum depth of 31 feet. Excavation was constantly delayed by water, which seeped into the cut from the surface and springs, and workers chiseled a ditch to redirect it. Meanwhile the surface of the towpath was leveled and a wooden sill was added to prevent the canal boats’ tow ropes from getting snagged.